WMEL documents
29 July 2025 · Updated: 29 July 2025
Linked below are the original, as I found them, documents issued by National Grid for the Weston Marsh to East Leicestershire extension of the ‘Great Grid Upgrade’. These files have been downloaded from National Grid’s website and are linked here from this website. That way, if National Grid chooses to change them in any underhand way (see the Post Office scandal), you will always have this website to refer to the documents as they were originally presented.
- WMEL Stage 1 Consultation Document
- WMEL Stage 1 Consultation Strategy
- WMEL Stage 1 Consultation Community Newsletter
- WMEL Stage 1 Consultation Community Newsletter Map
- WMEL Stage 1 Consultation Feedback Form
- WMEL Stage 1 Consultation Proposed New Overhead Line Route Sections and Substations Maps
- WMEL Stage 1 Consultation Reconductoring Sections Maps
- WMEL Corridor Preliminary Routeing and Siting Study (CPRSS)
- WMEL Strategic Options Report (SOR) June 2025
- WMEL Public Information Event banner - The Great Grid Upgrade in the region
- WMEL Public Information Event Banner
- WMEL Stage 1 Consultation Environmental Constraints Map
These links are presented in the same order as they are/were in National Grid’s Document library.